PROJECTS

Land Precision Corporation has vast experience in various Development, Municipal, State and Private projects since the early 90’s.

LAND PRECISION CORPORATION has completed projects in all the encompassing Tampa Bay Area counties since the early nineties.  The following is a short list of a few projects to reference our experience in various Development, Municipal, State, and notable private projects that involve infrastructure and transportation.

Current Projects:COT Surveys

City of Tampa Utilities:

24-C-009 FY23 Citywide WM R Build Projects

5-year contract – Emergency Repairs involves Survey Asbuilt

24-C-09004 Citywide Distribution Watermain Improvements Design-Build

5-year contract.  Initial project 7.5 miles of R/W Route Survey. To continue through development and asbuilts.  Additional R/W projects concurrent throughout duration.

Clearwater Airpark Renovations – Design Build:Land Survey Clearwater

A Topo Survey recently completed for design build.  Construction to begin in 2025.

City of Clearwater – Plat of Stevenson Creek City Property:

A Boundary Topo Survey and Platting Services

Emerson Towncenter East / West Utility Connections:

A current project in Pasco County that involves utility connections crossing a County Roadway.

Riverview Regional Park Entrance and Roundabout:

 A Hillsborough County project in Riverview involving roadway redevelopment of Riverview Drive with the installations of new utilities facilitating a roundabout.

FDOT / Pinellas County – State Road 586:

Post Hurricane Emergency Drainage Repair and Restoration.

 Rosery Road Multi-Use Path Project: City of Largo Multi Use Path Survey

A City of Largo project involving Sidewalk and a Multi-Use Trail. Project involves Highland Road, Lake Avenue, and other intersections.

FDOT SR580 Dunedin:

A FDOT & City of Dunedin Roadway Project – complete roadway redevelopment. Project located from US Alt 19 to Main Street / Bass Blvd., Dunedin.

Past Projects:

Turkey Creek Road @ Sydney Road and Airport Road:

A City of Plant City project involving Roadway realignment and redevelopment which involved Utilities.

Gandy Blvd Pinellas County Roadway/Bridge & City of St. Pete Waterline:

A Design Build project in cooperation with FDOT and the City of St. Pete. A three-year project with new roadways, land bridges and utilities including waterlines.

W Cleveland Street Project:

A City of Tampa project with brick road restoration and new pavement and utilities. Project location being W. Kennedy Street from S. Albany Ave east to Railroad tracks @ S. Willow Ave.

Reo Street Project:

A City of Tampa project road restoration and new pavement and utilities. Project located south of W. Cypress Street and west of SR60 overpass.

Safety Harbor Spa Redevelopment Planning Project:

A Boundary Topo Survey of the entire property. Construction Surveying and Asbuilts.  Parcel Separation and Re-Platting.

Additional Surveying Projects:

COMMERCIAL DEVELOPMENT
Palm Garden PlazaCommercial Land Survey
Palm Harbor Commons
Home Depot {St. Petersburg}
Keene Plaza
WaWa’s (Multiple Sites in Pinellas, Pasco, Hillsborough and Sarasota)
Thorntons (Pinellas) Wendy’s Rest. (Multiple Sites in Pinellas, Pasco, Hillsborough)
Restaurant Depot (Multiple Sites in Pinellas, Sarasota and Orange)
Auto Recovery Services of Hudson (Pasco)
Transitions Optical (Pinellas)
Parliament Coaches (Pinellas)
Gateway Commerce Center (Pinellas)
Macy’s Corp Campus (Pinellas)commercial boundary survey
Great Bay Distributors (Pinellas)
Bayshore Beautiful Neighborhood City of Tampa (Hillsborough)
Artisan Preserve Subdivision Dev. (Pinellas)
Dunedin Cove Subdivision Dev. (Pinellas)
James Museum of St. Pete (Pinellas)
Mira Bay Townhomes Dev. (Hillsborough)
7-11 Gandy (Pinellas)
Restaurant Depot (Sarasota)
Circle “K” in Springhill (Hernado)

SUBDIVISION DEVELOPMENTcommercial boundary survey
Whispering Wings Subdivision
Amberwoods Subdivision
Canterbury Estates
Savanna Oaks
Scottsdale Bluffs
Tara Subdivision
Cypress Hollow Subdivision
Long Branch Creek

MULTI-FAMILY DEVELOPMENTtopography survey Florida
Sweet Magnolia Place
Sable Palms ALF  Timber Pines ALF
Westshore  and Beach Place
Willow Greens
Timber Pines

ROADWAY AND MUNICIPAL PROJECTS
FDOT I-275 Tampa
Keene Road Dunedin
FDOT Pinellas Trail
SR 60 Gateway to Clearwater Beachcommercial constructon survey
Causeway Boulevard
South Mobley Regional Recreational Complex
Suncoast Parkway (Hernando)
I-275 (Pinellas)
US41 Ruskin (Hillsborough)
I4 / US98 Overpass Bridge
US19 NE Coachman Sunset Point (Pinellas)
Gandy Blvd @ 16th St (Pinellas)
Gandy Land Bridges 4th and 9th (Pinellas)
Belcher Road (Pinellas)
Hardin Road Realignment (Polk)
Missouri Ave (Pinellas)Pinellas County Surveyors
Eagles Nest of Belleair (Pinellas)
Seminole Lake Retention Project

LAND SURVEY PROJECTS

Boundary and/or Topo Surveys
Ranch Lake Plaza
Homosassa Center
70 Acres Todd Ranch on SR 54
561 Acres in Lake Alfred {Polk County}
12 Acres on State Road 54 {Pasco Co.}Land Surveys Florida
12.5 Acres on US19 {Hernando Co.}

PLAT SERVICES

Commercial Platting
Ranch Lake Plaza
Keene Plaza
Sheldon Linebaugh Commercial Center
Palm Garden Plaza
Winn Dixie {Seminole}
Commercial Construction Survey
Subdivision Single Family
Whispering Wings Subdivision
Amberwoods Sudivision
Savannah Oaks
Scottsdale Bluffs
Tara Subdivision
Cypress Hollow

Subdivision Multi Family
Sweet Magnolia Place
Sable Palms ALFmunicipal surveys florida
Westshore and Beach Place
Willow Greens

Airports
St. Petersburg Clearwater International Airport (PIE) (Pinellas)
Albert Whitted Airport (Pinellas)

Schools
Pasco Hillsborough Community College (Hernando Campus)
Leonard High School (Hillsborough)
Mabry Elementary School (W. Estrella St Hillsborough)Land Surveys Florida

Hospitals
Morton Plant Bay Care (Multiple Campuses)
Bayshore Beautiful Neighborhood City of Tampa (Hillsborough)

 

 

 

L.P.C. is a full-service professional surveying firm serving Hillsborough, Pinellas, Pasco & Manatee Counties with Professional Land Surveying Services.